ExpressSame day shipping possibleBusiness customers onlyQuote by email

Demander un devis info@loopspare.com

Industry

Spare parts for power plants with gas and steam turbines

In power plants, turbine controls, protection systems and control systems often run for a very long time. When a board fails, the manufacturer is often no longer the fastest source.

Typical systems

Systems from our catalog that are often in use in this industry.

Turbine control

GE Mark V765 pièces
GE Mark VI730 pièces
GE Mark VIe397 pièces
Woodward 50523 pièces
Woodward 230133 pièces
Woodward MicroNet63 pièces

Protection and monitoring

Woodward ProTech19 pièces
Bently Nevada 33001 429 pièces
Bently Nevada 3500334 pièces

Generator control

Woodward EGCP8 pièces

Control system

Emerson Ovation194 pièces
ABB Bailey Infi 90146 pièces
ABB Bailey Symphony95 pièces
Foxboro I/A Series691 pièces

How your inquiry works

Send part numbers and quantities through the inquiry form. You can paste a complete list or attach it as PDF, XLSX, XLS or CSV.

We ask our suppliers per item and reply by email with price, condition, warranty and lead time. Parts we cannot source are named as such in the quote.

Read how we check every part before it ships.

Shutdowns and turnarounds

For a shutdown or turnaround, send the complete spare parts list. In the message, give the date of the shutdown and by when the parts must be with you.

The quote states the lead time per item, so you see early what fits the date and what does not. We do not promise a date the supplier has not confirmed. For parts with a long lead time it pays to send the list well before the shutdown.